Skip to content

How AssuredForge governs delivery

Governance first

Every Release (a deployable package of one or more Features) moves through recorded stages: Deliveries (the commits that implement them) recorded, the delivered changes combined and tests run, user acceptance test (UAT) result recorded, approved with a signed decision, pushed to the main line (your main code line, the branch your team treats as the current version). A step that its rules do not allow is refused, with the reason.

Deployment recording against the approved Release is coming next, starting with the hosted edition. The desktop edition doesn't record deployments today.

Each release passes the readiness suite (one shared test suite) on the desktop edition and on the installation that runs our own internal pilot, before it reaches that pilot.

Human accountability

Only people approve: automation never does. Only a named person holding the required role, within its scope, can approve, and each approval records the person, the role assignment that authorized it and the reason. Roles are granted for the whole Tenant (your organization's account), a Workspace (a separate space inside it, for example for one client) or a Portfolio (a long-lived product line or initiative).

Traceability and the Digital Thread

The Digital Thread is one connected record from requirement to Release, approval and push, and back: Visions (business initiatives: the what and why), Requirements (statements of business need that must be satisfied and verified), Features, Releases, their Deliveries, UAT results, approvals and pushes in one connected record.

Audit and evidence

Every governed action (an action the platform records because its rules govern it, such as an approval, a sign-off or a decision) is written to a tamper-evident audit chain (a record of every governed action, whose entries cannot be updated or deleted by any role) that you can verify. A Tenant's records can be exported as a signed export that can be verified offline.

Sign-in

Local accounts with two-step verification that an organization can require for all its members. Sign-in with Microsoft Entra ID runs in Tierra's own internal pilot (an installation's own directory) and is planned for the hosted edition; sign-in from partner directories is planned. The desktop evaluation uses local accounts with two-step verification.

Works with your tools, optionally

AssuredForge is fully usable without third-party connectors (integrations to outside systems such as Jira or Azure DevOps) and without an assistant. Optional connectors for Jira, Confluence, Bitbucket and Azure DevOps exist. Connecting a partner's systems is set up together, by agreement, during the program. GitHub and GitLab are planned; PTC Windchill is planned with design partners. A connector write into an external tool needs a signed human decision.

Governed execution, human approval

Being validated

Agent-assisted planning and delivery is being validated for the desktop design-partner evaluation. It may recommend and prepare, and it never approves, accepts risk or authorizes a release.

Deeper pages: Governance and approvals, Traceability, Audit and evidence, Integrations, Works with, Governed execution.